Long Czech Hedgehog
The road-blocking sibling of the classic hedgehog. Its long body spans two cross-braced legs to draw a line — add barbed wire and it becomes a full emplacement.
In stock.
SKU: TWG-110
Our store has been open for orders since 7 October 2026. In-stock items usually ship within 1–3 business days; payment is taken by card through iyzico with 3D Secure.
What's in the box?
- Long Czech hedgehog kit (on sprue)
- NOTE: Barbed wire not included (shown in photos for display only)
Three reasons, clear differences.
Closes the road
The long body cuts a wide line in one piece; made for street and pass barricades.
Same language as the hedgehog
Works in the same scene as the classic Czech hedgehog for a consistent frontline.
Stronger with wire
Wrap barbed wire around the body and the obstacle becomes a full emplacement — as in the gallery shots.
How it works
Clip and assemble
Separate the parts from the sprue; build the cross-braced legs and slot the long body between them.
FIG. 01 — BUILD Prime and weather
Dark undercoat, then timber or metal tones; dust and rust settle it into the front.
FIG. 02 — PAINT Draw the line
Place it at a street mouth, a bridgehead or in front of a trench; the pass is closed.
FIG. 03 — DEPLOY Complete your kit.
Frequently bought together. Tick the boxes and add them all in one click — this product is already selected.
The spec sheet.
What do painters say?
Write your review
— Terminal Log —
Related Posts for This Product
Field Guides
Basing Techniques: A Complete Guide
How do you finish a miniature base with dirt, grass, rocks and snow? A step-by-step basing guide with material...
Open File →
Field Guides
Water Effects: A Step-by-Step Base Guide
How do you make realistic water, ripples and puddles on a base? Learn water effects from scratch with resin, g...
Open File →
Field Guides
Snow Effects: Realistic Snow on Miniatures
How do you make realistic snow on a miniature base? Texture, accumulation logic and balanced shine to build co...
Open File →